Cost Breakdown
Name/Model: Scylla
Technology: Clan
Tonnage: 100
Configuration: Biped BattleMech
=================================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (297 pts) 15.5 x 20,000 310,000.00
Internal Structure (Endo Steel): 100 x 1,600 x 1 (+) 160,000.00 = 470,000.00
Myomer (Standard): 100 x 2,000 (+) 200,000.00 = 670,000.00
Engine (XL): (20,000 x 400 x 100) / 75 (+) 10,666,666.67 = 11,336,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 12,536,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 12,736,666.67
Life Support: 50,000 (+) 50,000.00 = 12,786,666.67
Sensors: 100 x 2,000 (+) 200,000.00 = 12,986,666.67
Heat Sinks (Double): 17 x 6,000 (+) 102,000.00 = 13,088,666.67
Arm Actuators: 100 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 30,000.00 = 13,118,666.67
Leg Actuators: 100 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 70,000.00 = 13,188,666.67
---------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 13,188,666.67
=================================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
ER Large Laser 200,000 (+) 200,000.00 = 300,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 380,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 460,000.00
Jump Jets 100 x (4 x 4) x 200 (+) 320,000.00 = 780,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,180,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,180,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,180,000.00
LRM 20 250,000 (+) 250,000.00 = 1,430,000.00
LRM 20 250,000 (+) 250,000.00 = 1,680,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,680,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,680,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,680,000.00
---------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,680,000.00
=================================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 13,188,666.67
Weapons and Equipment Cost: (+) 1,680,000.00 = 14,868,666.67
BattleMech Cost Multiplier: 1 + (100 / 100) (*) 2.00 = 29,737,333.33
---------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 29,737,333.00
|