Cost Breakdown
Name/Model: Assassin ASN-30
Technology: Inner Sphere
Tonnage: 40
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (104 pts) 6.5 x 10,000 65,000.00
Internal Structure (Endo Steel): 40 x 1,600 x 1 (+) 64,000.00 = 129,000.00
Myomer (Standard): 40 x 2,000 (+) 80,000.00 = 209,000.00
Engine (Light Fusion): (15,000 x 280 x 40) / 75 (+) 2,240,000.00 = 2,449,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 3,349,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 3,549,000.00
Life Support: 50,000 (+) 50,000.00 = 3,599,000.00
Sensors: 40 x 2,000 (+) 80,000.00 = 3,679,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 3,739,000.00
Arm Actuators: 40 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 15,200.00 = 3,754,200.00
Leg Actuators: 40 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 28,000.00 = 3,782,200.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,782,200.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Medium Laser 80,000 80,000.00
Jump Jets 40 x (7 x 7) x 200 (+) 392,000.00 = 472,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 722,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 722,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 722,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,782,200.00
Weapons and Equipment Cost: (+) 722,000.00 = 4,504,200.00
BattleMech Cost Multiplier: 1 + (40 / 100) (*) 1.40 = 6,305,880.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,305,880.00
|