Cost Breakdown
Name/Model: Grand Dragon DRG-7K
Technology: Inner Sphere
Tonnage: 60
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (160 pts) 10.0 x 10,000 100,000.00
Internal Structure (Endo Steel): 60 x 1,600 x 1 (+) 96,000.00 = 196,000.00
Myomer (MASC): (360 x 3 x 1,000) + (60 x 2,000) (+) 1,200,000.00 = 1,396,000.00
Engine (XL): (20,000 x 360 x 60) / 75 (+) 5,760,000.00 = 7,156,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 8,356,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,556,000.00
Life Support: 50,000 (+) 50,000.00 = 8,606,000.00
Sensors: 60 x 2,000 (+) 120,000.00 = 8,726,000.00
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 8,816,000.00
Arm Actuators: 60 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 22,800.00 = 8,838,800.00
Leg Actuators: 60 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 42,000.00 = 8,880,800.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,880,800.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 380,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 460,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 540,000.00
ER PPC 300,000 (+) 300,000.00 = 840,000.00
MRM 10 50,000 (+) 50,000.00 = 890,000.00
MRM 10 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 890,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 890,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,880,800.00
Weapons and Equipment Cost: (+) 890,000.00 = 9,770,800.00
BattleMech Cost Multiplier: 1 + (60 / 100) (*) 1.60 = 15,633,280.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 15,633,280.00
|