Cost Breakdown
Name/Model: Firefly 2 (Infernofly) TRHK-00.2-FF-2
Technology: Clan (Mixed)
Tonnage: 30
Configuration: VTOL Combat Vehicle
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Standard) (48 pts) 3.0 x 10,000 30,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 60,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 75,000.00
Rotors 3 x 40,000 (+) 120,000.00 = 195,000.00
Engine (XL) (20,000 x 160 x 30) / 75 (+) 1,280,000.00 = 1,475,000.00
Heat Sinks (Single) 6 x 2,000 (+) 12,000.00 = 1,487,000.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,487,000.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ER Flamer 15,000 (+) 15,000.00 = 65,000.00
ER Flamer 15,000 (+) 15,000.00 = 80,000.00
ER Flamer 15,000 (+) 15,000.00 = 95,000.00
ER Flamer 15,000 (+) 15,000.00 = 110,000.00
Heavy Flamer 11,250 (+) 11,250.00 = 121,250.00
Heavy Flamer 11,250 (+) 11,250.00 = 132,500.00
Heavy Flamer (Ammo 10) [Inferno] [Empty Bin] 0 (+) 0.00 = 132,500.00
Heavy Flamer (Ammo 10) [Inferno] [Empty Bin] 0 (+) 0.00 = 132,500.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 132,500.00
===================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost 1,487,000.00
Weapons and Equipment Cost (+) 132,500.00 = 1,619,500.00
Combat Vehicle Cost Multiplier 1 + (30 / 30) (*) 2 = 3,239,000.00
-------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,239,000.00
|