Cost Breakdown
Name/Model: Caveman CVN - 202
Technology: Inner Sphere
Tonnage: 65
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (211 pts) 13.5 x 10,000 135,000.00
Internal Structure (Endo Steel): 65 x 1,600 x 1 (+) 104,000.00 = 239,000.00
Myomer (Standard): 65 x 2,000 (+) 130,000.00 = 369,000.00
Engine (XL): (20,000 x 325 x 65) / 75 (+) 5,633,333.33 = 6,002,333.33
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 7,202,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,402,333.33
Life Support: 50,000 (+) 50,000.00 = 7,452,333.33
Sensors: 65 x 2,000 (+) 130,000.00 = 7,582,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 7,642,333.33
Arm Actuators: 65 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 29,900.00 = 7,672,233.33
Leg Actuators: 65 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 45,500.00 = 7,717,733.33
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,717,733.33
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 130,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 210,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 290,000.00
ER Small Laser 11,250 (+) 11,250.00 = 301,250.00
LB 10-X AC 400,000 (+) 400,000.00 = 701,250.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,101,250.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,101,250.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,101,250.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,101,250.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,101,250.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,717,733.33
Weapons and Equipment Cost: (+) 1,101,250.00 = 8,818,983.33
BattleMech Cost Multiplier: 1 + (65 / 100) (*) 1.65 = 14,551,322.50
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 14,551,322.00
|