Cost Breakdown
Name/Model: Lumberjack PBN-1
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Standard): (224 pts) 14.0 x 10,000 140,000.00
Internal Structure (Standard): 75 x 400 x 1 (+) 30,000.00 = 170,000.00
Myomer (Triple-Strength): 75 x 16,000 (+) 1,200,000.00 = 1,370,000.00
Engine (XL): (20,000 x 300 x 75) / 75 (+) 6,000,000.00 = 7,370,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 8,270,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,470,000.00
Life Support: 50,000 (+) 50,000.00 = 8,520,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 8,670,000.00
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 8,742,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 8,776,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 8,829,000.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,829,000.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 600,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 600,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 600,000.00
Hatchet 5 x 5,000 (+) 25,000.00 = 625,000.00
Jump Jets 75 x (4 x 4) x 200 (+) 240,000.00 = 865,000.00
Medium Laser 40,000 (+) 40,000.00 = 905,000.00
Medium Laser 40,000 (+) 40,000.00 = 945,000.00
Medium Laser 40,000 (+) 40,000.00 = 985,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 985,000.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,829,000.00
Weapons and Equipment Cost: (+) 985,000.00 = 9,814,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 17,174,500.00
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 17,174,500.00
|