Cost Breakdown
Name/Model: Savage SVE-A0
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Standard): (231 pts) 14.5 x 10,000 145,000.00
Internal Structure (Standard): 75 x 400 x 1 (+) 30,000.00 = 175,000.00
Myomer (Triple-Strength): 75 x 16,000 (+) 1,200,000.00 = 1,375,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 8,875,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 10,075,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 10,275,000.00
Life Support: 50,000 (+) 50,000.00 = 10,325,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 10,475,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 10,535,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 10,569,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 10,622,000.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,622,000.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
ER Large Laser 200,000 (+) 200,000.00 = 400,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 480,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 560,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 760,000.00
Jump Jets 75 x (5 x 5) x 200 (+) 375,000.00 = 1,135,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,195,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,255,000.00
Sword 4 x 10,000 (+) 40,000.00 = 1,295,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,295,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,622,000.00
Weapons and Equipment Cost: (+) 1,295,000.00 = 11,917,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 20,854,750.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 20,854,750.00
|