Cost Breakdown
Name/Model: Wildcat Prime
Technology: Clan
Tonnage: 55
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Standard): (176 pts) 11.0 x 10,000 110,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 198,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 308,000.00
Engine (XL): (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 4,341,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,241,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 5,441,333.33
Life Support: 50,000 (+) 50,000.00 = 5,491,333.33
Sensors: 55 x 2,000 (+) 110,000.00 = 5,601,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 5,661,333.33
Arm Actuators: 55 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 11,000.00 = 5,672,333.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 5,710,833.33
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,710,833.33
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
ECM Suite 200,000 (+) 200,000.00 = 300,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 380,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 460,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 860,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,260,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,260,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,260,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,260,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,260,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,260,000.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,710,833.33
Weapons and Equipment Cost: (+) 1,260,000.00 = 6,970,833.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 10,804,791.67
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,804,792.00
|