Cost Breakdown
Name/Model: Behemoth 2c
Technology: Clan
Tonnage: 100
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Standard): (288 pts) 18.0 x 10,000 180,000.00
Internal Structure (Standard): 100 x 400 x 1 (+) 40,000.00 = 220,000.00
Myomer (Standard): 100 x 2,000 (+) 200,000.00 = 420,000.00
Engine (Fusion): (5,000 x 300 x 100) / 75 (+) 2,000,000.00 = 2,420,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 3,320,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 3,520,000.00
Life Support: 50,000 (+) 50,000.00 = 3,570,000.00
Sensors: 100 x 2,000 (+) 200,000.00 = 3,770,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 3,830,000.00
Arm Actuators: 100 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 20,000.00 = 3,850,000.00
Leg Actuators: 100 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 70,000.00 = 3,920,000.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,920,000.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
ER PPC 300,000 (+) 300,000.00 = 400,000.00
ER PPC 300,000 (+) 300,000.00 = 700,000.00
Jump Jets 100 x (3 x 3) x 200 (+) 180,000.00 = 880,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 1,480,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 2,080,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 2,080,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 2,080,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 2,080,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 2,080,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 2,096,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,096,000.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,920,000.00
Weapons and Equipment Cost: (+) 2,096,000.00 = 6,016,000.00
BattleMech Cost Multiplier: 1 + (100 / 100) (*) 2.00 = 12,032,000.00
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 12,032,000.00
|