Cost Breakdown
Name/Model: Vedette Medium Tank (Armored Anti-Armor)
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (158 pts) 8.0 x 25,000 200,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 250,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 275,000.00
Engine (Fuel Cell) (3,500 x 250 x 50) / 75 (+) 583,333.33 = 858,333.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 860,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 867,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 867,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 450,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 455,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 460,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 460,000.00
SRM 4 60,000 (+) 60,000.00 = 520,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 520,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 520,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 867,833.33
Weapons and Equipment Cost (+) 520,000.00 = 1,387,833.33
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 2,081,750.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,081,750.00
|