Cost Breakdown
Name/Model: Black Knight BL-10-KNT
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (231 pts) 14.5 x 10,000 145,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 265,000.00
Myomer (Triple-Strength): 75 x 16,000 (+) 1,200,000.00 = 1,465,000.00
Engine (Fusion): (5,000 x 300 x 75) / 75 (+) 1,500,000.00 = 2,965,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 3,865,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,065,000.00
Life Support: 50,000 (+) 50,000.00 = 4,115,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 4,265,000.00
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 4,355,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 4,389,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 4,442,000.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,442,000.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Beagle Active Probe 200,000 200,000.00
ER Large Laser 200,000 (+) 200,000.00 = 400,000.00
ER Large Laser 200,000 (+) 200,000.00 = 600,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 680,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 760,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 840,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 920,000.00
ER PPC 300,000 (+) 300,000.00 = 1,220,000.00
Sword 4 x 10,000 (+) 40,000.00 = 1,260,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,260,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,442,000.00
Weapons and Equipment Cost: (+) 1,260,000.00 = 5,702,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 9,978,500.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 9,978,500.00
|