Cost Breakdown
Name/Model: Hatamoto-Oni HTM-27X
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (247 pts) 15.5 x 10,000 155,000.00
Internal Structure (Standard): 80 x 400 x 1 (+) 32,000.00 = 187,000.00
Myomer (Triple-Strength): 80 x 16,000 (+) 1,280,000.00 = 1,467,000.00
Engine (XL): (20,000 x 320 x 80) / 75 (+) 6,826,666.67 = 8,293,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,493,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,693,666.67
Life Support: 50,000 (+) 50,000.00 = 9,743,666.67
Sensors: 80 x 2,000 (+) 160,000.00 = 9,903,666.67
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 9,993,666.67
Arm Actuators: 80 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 30,400.00 = 10,024,066.67
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 10,080,066.67
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,080,066.67
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
ER PPC 300,000 (+) 300,000.00 = 600,000.00
Jump Jets 80 x (4 x 4) x 200 (+) 256,000.00 = 856,000.00
Streak SRM 6 120,000 (+) 120,000.00 = 976,000.00
Streak SRM 6 120,000 (+) 120,000.00 = 1,096,000.00
Streak SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,096,000.00
Streak SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,096,000.00
Sword 4 x 10,000 (+) 40,000.00 = 1,136,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,136,000.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,080,066.67
Weapons and Equipment Cost: (+) 1,136,000.00 = 11,216,066.67
BattleMech Cost Multiplier: 1 + (80 / 100) (*) 1.80 = 20,188,920.00
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 20,188,920.00
|