Cost Breakdown
Name/Model: RX-79[G] Gundam Ground Type (180mm Cannon)
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (185 pts) 10.5 x 20,000 210,000.00
Internal Structure (Standard): 55 x 400 x 1 (+) 22,000.00 = 232,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 342,000.00
Engine (Fusion): (5,000 x 275 x 55) / 75 (+) 1,008,333.33 = 1,350,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,250,333.33
Cockpit (Torso-Mounted): 750,000 (+) 750,000.00 = 3,000,333.33
Life Support: 50,000 (+) 50,000.00 = 3,050,333.33
Sensors: 55 x 2,000 (+) 110,000.00 = 3,160,333.33
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 25,300.00 = 3,185,633.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 3,224,133.33
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,224,133.33
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
Heavy Rifle 90,000 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Jump Jets 55 x (3 x 3) x 200 (+) 99,000.00 = 189,000.00
Machine Gun 5,000 (+) 5,000.00 = 194,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 194,000.00
Small Shield 50,000 (+) 50,000.00 = 244,000.00
SRM 2 10,000 (+) 10,000.00 = 254,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 254,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 254,000.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,224,133.33
Weapons and Equipment Cost: (+) 254,000.00 = 3,478,133.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 5,391,106.67
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 5,391,107.00
|