Cost Breakdown
Name/Model: MAV-1 Maverick C
Technology: Inner Sphere
Tonnage: 60
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (201 pts) 13.0 x 10,000 130,000.00
Internal Structure (Endo Steel): 60 x 1,600 x 1 (+) 96,000.00 = 226,000.00
Myomer (Standard): 60 x 2,000 (+) 120,000.00 = 346,000.00
Engine (Fusion): (5,000 x 240 x 60) / 75 (+) 960,000.00 = 1,306,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,206,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,406,000.00
Life Support: 50,000 (+) 50,000.00 = 2,456,000.00
Sensors: 60 x 2,000 (+) 120,000.00 = 2,576,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,636,000.00
Arm Actuators: 60 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 19,800.00 = 2,655,800.00
Leg Actuators: 60 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 42,000.00 = 2,697,800.00
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,697,800.00
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Jump Jets 60 x (4 x 4) x 200 (+) 192,000.00 = 492,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 1,092,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,092,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,092,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,092,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,097,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,097,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,137,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,177,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,217,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,217,000.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,697,800.00
Weapons and Equipment Cost: (+) 1,217,000.00 = 3,914,800.00
BattleMech Cost Multiplier: 1 + (60 / 100) (*) 1.60 = 6,263,680.00
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,263,680.00
|