Cost Breakdown
Name/Model: Chevalier Speed
Technology: Inner Sphere
Tonnage: 35
Configuration: Wheeled Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (80 pts) 4.5 x 20,000 90,000.00
Internal Structure (Standard) 3.5 x 10,000 (+) 35,000.00 = 125,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 145,000.00
Engine (Fusion) (5,000 x 225 x 35) / 75 (+) 525,000.00 = 670,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 674,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 676,500.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 676,500.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 215,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 215,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 215,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 676,500.00
Weapons and Equipment Cost (+) 215,000.00 = 891,500.00
Combat Vehicle Cost Multiplier 1 + (35 / 200) (*) 1.175 = 1,047,512.50
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,047,513.00
|