Cost Breakdown
Name/Model: Zeus ZEU-7T
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped BattleMech
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Standard): (240 pts) 15.0 x 10,000 150,000.00
Internal Structure (Endo Steel): 80 x 1,600 x 1 (+) 128,000.00 = 278,000.00
Myomer (Triple-Strength): 80 x 16,000 (+) 1,280,000.00 = 1,558,000.00
Engine (Fusion): (5,000 x 320 x 80) / 75 (+) 1,706,666.67 = 3,264,666.67
Gyro (XL): 2.0 x 750,000 (+) 1,500,000.00 = 4,764,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,964,666.67
Life Support: 50,000 (+) 50,000.00 = 5,014,666.67
Sensors: 80 x 2,000 (+) 160,000.00 = 5,174,666.67
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 5,240,666.67
Arm Actuators: 80 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 24,000.00 = 5,264,666.67
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 5,320,666.67
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,320,666.67
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Flamer 7,500 (+) 7,500.00 = 307,500.00
Large Pulse Laser 175,000 (+) 175,000.00 = 482,500.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 542,500.00
MML 7 105,000 (+) 105,000.00 = 647,500.00
MML 7 105,000 (+) 105,000.00 = 752,500.00
MML 7 (Ammo 14) [SRM] [Empty Bin] 0 (+) 0.00 = 752,500.00
MML 7 (Ammo 17) [LRM] [Empty Bin] 0 (+) 0.00 = 752,500.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,052,500.00
Targeting Computer 4 x 10,000 (+) 40,000.00 = 1,092,500.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,092,500.00
=======================================================================================================================
BattleMech Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,320,666.67
Weapons and Equipment Cost: (+) 1,092,500.00 = 6,413,166.67
BattleMech Cost Multiplier: 1 + (80 / 100) (*) 1.80 = 11,543,700.00
-----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 11,543,700.00
|