Cost Breakdown
Name/Model: Mauler MAL-1X
Technology: Inner Sphere
Tonnage: 90
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (216 pts) 13.5 x 10,000 135,000.00
Internal Structure (Standard): 90 x 400 x 1 (+) 36,000.00 = 171,000.00
Myomer (Standard): 90 x 2,000 (+) 180,000.00 = 351,000.00
Engine (XL): (20,000 x 270 x 90) / 75 (+) 6,480,000.00 = 6,831,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 7,731,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,931,000.00
Life Support: 50,000 (+) 50,000.00 = 7,981,000.00
Sensors: 90 x 2,000 (+) 180,000.00 = 8,161,000.00
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 8,233,000.00
Arm Actuators: 90 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 27,000.00 = 8,260,000.00
Leg Actuators: 90 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 63,000.00 = 8,323,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,323,000.00
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
ER Large Laser 200,000 (+) 200,000.00 = 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,200,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LRM 15 175,000 (+) 175,000.00 = 1,375,000.00
LRM 15 175,000 (+) 175,000.00 = 1,550,000.00
LRM 15 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,550,000.00
LRM 15 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,550,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,550,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,323,000.00
Weapons and Equipment Cost: (+) 1,550,000.00 = 9,873,000.00
BattleMech Cost Multiplier: 1 + (90 / 100) (*) 1.90 = 18,758,700.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 18,758,700.00
|