Cost Breakdown
Name/Model: UrbanMech (Little Beamer Boy) UM-PPC
Technology: Inner Sphere
Tonnage: 30
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (96 pts) 6.0 x 10,000 60,000.00
Internal Structure (Endo Steel): 30 x 1,600 x 1 (+) 48,000.00 = 108,000.00
Myomer (Standard): 30 x 2,000 (+) 60,000.00 = 168,000.00
Engine (XL): (20,000 x 60 x 30) / 75 (+) 480,000.00 = 648,000.00
Gyro (XL): 0.5 x 750,000 (+) 375,000.00 = 1,023,000.00
Cockpit (Small): 175,000 (+) 175,000.00 = 1,198,000.00
Life Support: 50,000 (+) 50,000.00 = 1,248,000.00
Sensors: 30 x 2,000 (+) 60,000.00 = 1,308,000.00
Heat Sinks (Single): 8 x 2,000 (+) 16,000.00 = 1,324,000.00
Arm Actuators: 30 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 6,000.00 = 1,330,000.00
Leg Actuators: 30 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 21,000.00 = 1,351,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,351,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Jump Jets 30 x (2 x 2) x 200 (+) 24,000.00 = 124,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 424,000.00
Targeting Computer 2 x 10,000 (+) 20,000.00 = 444,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 444,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,351,000.00
Weapons and Equipment Cost: (+) 444,000.00 = 1,795,000.00
BattleMech Cost Multiplier: 1 + (30 / 100) (*) 1.30 = 2,333,500.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 2,333,500.00
|