Cost Breakdown
Name/Model: Dasher (Fire Moth) A
Technology: Clan
Tonnage: 20
Configuration: Biped OmniMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (38 pts) 2.0 x 20,000 40,000.00
Internal Structure (Endo Steel): 20 x 1,600 x 1 (+) 32,000.00 = 72,000.00
Myomer (MASC): (200 x 1 x 1,000) + (20 x 2,000) (+) 240,000.00 = 312,000.00
Engine (XL): (20,000 x 200 x 20) / 75 (+) 1,066,666.67 = 1,378,666.67
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 1,978,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,178,666.67
Life Support: 50,000 (+) 50,000.00 = 2,228,666.67
Sensors: 20 x 2,000 (+) 40,000.00 = 2,268,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,328,666.67
Arm Actuators: 20 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 9,200.00 = 2,337,866.67
Leg Actuators: 20 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 14,000.00 = 2,351,866.67
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,351,866.67
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Active Probe 200,000 200,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 300,000.00
Anti-Missile System (Ammo 24) [Empty Bin] 0 (+) 0.00 = 300,000.00
CASE 2 x 50,000 (+) 100,000.00 = 400,000.00
Streak SRM 4 90,000 (+) 90,000.00 = 490,000.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 490,000.00
TAG 50,000 (+) 50,000.00 = 540,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 540,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,351,866.67
Weapons and Equipment Cost: (+) 540,000.00 = 2,891,866.67
OmniMech Conversion Cost: (2,351,866.67 + 540,000.00) x 0.25 (+) 722,966.67 = 3,614,833.33
BattleMech Cost Multiplier: 1 + (20 / 100) (*) 1.20 = 4,337,800.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 4,337,800.00
|