Cost Breakdown
Name/Model: Hun-CL Heavy Tank CL
Technology: Clan (Mixed)
Tonnage: 60
Configuration: Tracked OmniVehicle
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (198 pts) 10.0 x 25,000 250,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 310,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 340,000.00
Engine (Fuel Cell) (3,500 x 240 x 60) / 75 (+) 672,000.00 = 1,012,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,014,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 1,021,500.00
Power Amplifiers 0.5 x 20,000 (+) 10,000.00 = 1,031,500.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,031,500.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
Armored Motive System 6 x 100,000 600,000.00
CASE 1 x 50,000 (+) 50,000.00 = 650,000.00
Chassis Modification, Limited Amphibious 2.5 x 10,000 (+) 25,000.00 = 675,000.00
Large Chemical Laser 75,000 (+) 75,000.00 = 750,000.00
Large Chemical Laser (Ammo 10) [Empty Bin] 0 (+) 0.00 = 750,000.00
Large Chemical Laser (Ammo 10) [Empty Bin] 0 (+) 0.00 = 750,000.00
Light Machine Gun (IS) 5,000 (+) 5,000.00 = 755,000.00
Light Machine Gun (Ammo 100) [Empty Bin] (IS) 0 (+) 0.00 = 755,000.00
Micro Pulse Laser 12,500 (+) 12,500.00 = 767,500.00
Streak SRM 4 (IS) 90,000 (+) 90,000.00 = 857,500.00
Streak SRM 4 (IS) 90,000 (+) 90,000.00 = 947,500.00
Streak SRM 4 (Ammo 25) [Empty Bin] (IS) 0 (+) 0.00 = 947,500.00
Streak SRM 4 (Ammo 25) [Empty Bin] (IS) 0 (+) 0.00 = 947,500.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 947,500.00
===================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost 1,031,500.00
Weapons and Equipment Cost (+) 947,500.00 = 1,979,000.00
Omni Conversion Cost 1,979,000.00 x 0.25 (+) 494,750.00 = 2,473,750.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 3,958,000.00
-------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,958,000.00
|