Cost Breakdown
Name/Model: Manticore IIC Heavy Tank
Technology: Clan
Tonnage: 60
Configuration: Tracked Combat Vehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (211 pts) 11.0 x 20,000 220,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 280,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 310,000.00
Engine (XL) (20,000 x 240 x 60) / 75 (+) 3,840,000.00 = 4,150,000.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 4,160,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 4,167,500.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,167,500.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
ATM 6 125,000 125,000.00
ATM 6 (Ammo 10) [Empty Bin] 0 (+) 0.00 = 125,000.00
ATM 6 (Ammo 10) [ER] [Empty Bin] 0 (+) 0.00 = 125,000.00
ATM 6 (Ammo 10) [HE] [Empty Bin] 0 (+) 0.00 = 125,000.00
CASE 1 x 50,000 (+) 50,000.00 = 175,000.00
ER PPC 300,000 (+) 300,000.00 = 475,000.00
Medium Chemical Laser 30,000 (+) 30,000.00 = 505,000.00
Medium Chemical Laser (Ammo 30) [Empty Bin] 0 (+) 0.00 = 505,000.00
Streak LRM 10 225,000 (+) 225,000.00 = 730,000.00
Streak LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 730,000.00
Streak LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 730,000.00
Supercharger 240 x 10,000 (+) 2,400,000.00 = 3,130,000.00
Targeting Computer 2 x 10,000 (+) 20,000.00 = 3,150,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,150,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 4,167,500.00
Weapons and Equipment Cost (+) 3,150,000.00 = 7,317,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 11,708,000.00
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 11,708,000.00
|