Cost Breakdown
Name/Model: Von Luckner Heavy Tank VNL-K105N
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (208 pts) 10.5 x 25,000 262,500.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 337,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 377,500.00
Engine (XL) (20,000 x 300 x 75) / 75 (+) 6,000,000.00 = 6,377,500.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 6,387,500.00
Turret 2 x 5,000 (+) 10,000.00 = 6,397,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,397,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Heavy PPC 250,000 (+) 250,000.00 = 400,000.00
LRM 10 100,000 (+) 100,000.00 = 500,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 500,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 500,000.00
Machine Gun 5,000 (+) 5,000.00 = 505,000.00
Machine Gun 5,000 (+) 5,000.00 = 510,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 510,000.00
SRM 4 60,000 (+) 60,000.00 = 570,000.00
SRM 4 (Ammo 25) [Inferno] [Empty Bin] 0 (+) 0.00 = 570,000.00
SRM 6 80,000 (+) 80,000.00 = 650,000.00
SRM 6 80,000 (+) 80,000.00 = 730,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 730,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 730,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 730,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 6,397,500.00
Weapons and Equipment Cost (+) 730,000.00 = 7,127,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 12,473,125.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,473,125.00
|