Cost Breakdown
Name/Model: Untitled
Technology: Inner Sphere
Tonnage: 100
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Laser Reflective): (304 pts) 19.0 x 30,000 570,000.00
Internal Structure (Standard): 100 x 400 x 1 (+) 40,000.00 = 610,000.00
Myomer (Standard): 100 x 2,000 (+) 200,000.00 = 810,000.00
Engine (Fusion): (5,000 x 300 x 100) / 75 (+) 2,000,000.00 = 2,810,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 3,710,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 3,910,000.00
Life Support: 50,000 (+) 50,000.00 = 3,960,000.00
Sensors: 100 x 2,000 (+) 200,000.00 = 4,160,000.00
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 4,250,000.00
Arm Actuators: 100 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 30,000.00 = 4,280,000.00
Leg Actuators: 100 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 70,000.00 = 4,350,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,350,000.00
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Anti-Battle Armor Pod 2,500 2,500.00
Anti-Battle Armor Pod 2,500 (+) 2,500.00 = 5,000.00
Anti-Battle Armor Pod 2,500 (+) 2,500.00 = 7,500.00
Anti-Missile System 100,000 (+) 100,000.00 = 107,500.00
Anti-Missile System 100,000 (+) 100,000.00 = 207,500.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 207,500.00
Heavy PPC 250,000 (+) 250,000.00 = 457,500.00
Heavy PPC 250,000 (+) 250,000.00 = 707,500.00
MRM 20 125,000 (+) 125,000.00 = 832,500.00
MRM 20 125,000 (+) 125,000.00 = 957,500.00
MRM 20 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 957,500.00
MRM 20 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 957,500.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 957,500.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,350,000.00
Weapons and Equipment Cost: (+) 957,500.00 = 5,307,500.00
BattleMech Cost Multiplier: 1 + (100 / 100) (*) 2.00 = 10,615,000.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,615,000.00
|