Cost Breakdown
Name/Model: NOT A PANTHER A
Technology: Inner Sphere
Tonnage: 35
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Hardened): (88 pts) 11.0 x 15,000 165,000.00
Internal Structure (Endo Steel): 35 x 1,600 x 1 (+) 56,000.00 = 221,000.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 291,000.00
Engine (Fusion): (5,000 x 140 x 35) / 75 (+) 326,666.67 = 617,666.67
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 1,217,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 1,417,666.67
Life Support: 50,000 (+) 50,000.00 = 1,467,666.67
Sensors: 35 x 2,000 (+) 70,000.00 = 1,537,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 1,597,666.67
Arm Actuators: 35 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 16,100.00 = 1,613,766.67
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 1,638,266.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,638,266.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Actuator Enhancement System 35 x 500 17,500.00
C3 Slave 250,000 (+) 250,000.00 = 267,500.00
Chameleon LPS 600,000 (+) 600,000.00 = 867,500.00
ER PPC 300,000 (+) 300,000.00 = 1,167,500.00
Jump Jets 35 x (4 x 4) x 200 (+) 112,000.00 = 1,279,500.00
Supercharger 140 x 10,000 (+) 1,400,000.00 = 2,679,500.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 2,689,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,689,500.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,638,266.67
Weapons and Equipment Cost: (+) 2,689,500.00 = 4,327,766.67
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 5,842,485.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 5,842,485.00
|