Cost Breakdown
Name/Model: NOT A PANTHER 2 A
Technology: Inner Sphere
Tonnage: 35
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Hardened): (88 pts) 11.0 x 15,000 165,000.00
Internal Structure (Endo Steel): 35 x 1,600 x 1 (+) 56,000.00 = 221,000.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 291,000.00
Engine (XL): (20,000 x 140 x 35) / 75 (+) 1,306,666.67 = 1,597,666.67
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 2,197,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,397,666.67
Life Support: 50,000 (+) 50,000.00 = 2,447,666.67
Sensors: 35 x 2,000 (+) 70,000.00 = 2,517,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,577,666.67
Arm Actuators: 35 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 16,100.00 = 2,593,766.67
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 2,618,266.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,618,266.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Actuator Enhancement System 35 x 500 17,500.00
C3 Slave 250,000 (+) 250,000.00 = 267,500.00
Heavy PPC 250,000 (+) 250,000.00 = 517,500.00
Jump Jets 35 x (4 x 4) x 200 (+) 112,000.00 = 629,500.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 639,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 639,500.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,618,266.67
Weapons and Equipment Cost: (+) 639,500.00 = 3,257,766.67
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 4,397,985.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 4,397,985.00
|