Cost Breakdown
Name/Model: Savage Coyote PRIME
Technology: Clan
Tonnage: 85
Configuration: Biped OmniMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (240 pts) 15.0 x 10,000 150,000.00
Internal Structure (Standard): 85 x 400 x 1 (+) 34,000.00 = 184,000.00
Myomer (Standard): 85 x 2,000 (+) 170,000.00 = 354,000.00
Engine (XL): (20,000 x 255 x 85) / 75 (+) 5,780,000.00 = 6,134,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 7,034,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,234,000.00
Life Support: 50,000 (+) 50,000.00 = 7,284,000.00
Sensors: 85 x 2,000 (+) 170,000.00 = 7,454,000.00
Heat Sinks (Double): 17 x 6,000 (+) 102,000.00 = 7,556,000.00
Arm Actuators: 85 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 17,000.00 = 7,573,000.00
Leg Actuators: 85 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 59,500.00 = 7,632,500.00
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,632,500.00
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
ATM 12 350,000 350,000.00
ATM 12 350,000 (+) 350,000.00 = 700,000.00
ATM 12 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
ATM 12 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
ATM 12 (Ammo 5) [ER] [Empty Bin] 0 (+) 0.00 = 700,000.00
ATM 12 (Ammo 5) [ER] [Empty Bin] 0 (+) 0.00 = 700,000.00
ATM 12 (Ammo 5) [HE] [Empty Bin] 0 (+) 0.00 = 700,000.00
ATM 12 (Ammo 5) [HE] [Empty Bin] 0 (+) 0.00 = 700,000.00
CASE 3 x 50,000 (+) 150,000.00 = 850,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 930,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 1,010,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 1,090,000.00
ER PPC 300,000 (+) 300,000.00 = 1,390,000.00
ER Small Laser 11,250 (+) 11,250.00 = 1,401,250.00
ER Small Laser 11,250 (+) 11,250.00 = 1,412,500.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,812,500.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,812,500.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,812,500.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,812,500.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,632,500.00
Weapons and Equipment Cost: (+) 1,812,500.00 = 9,445,000.00
OmniMech Conversion Cost: (7,632,500.00 + 1,812,500.00) x 0.25 (+) 2,361,250.00 = 11,806,250.00
BattleMech Cost Multiplier: 1 + (85 / 100) (*) 1.85 = 21,841,562.50
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 21,841,563.00
|