Cost Breakdown
Name/Model: Black Hawk 2
Technology: Clan
Tonnage: 50
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Standard): (152 pts) 9.5 x 10,000 95,000.00
Internal Structure (Endo Steel): 50 x 1,600 x 1 (+) 80,000.00 = 175,000.00
Myomer (Standard): 50 x 2,000 (+) 100,000.00 = 275,000.00
Engine (XL): (20,000 x 250 x 50) / 75 (+) 3,333,333.33 = 3,608,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 4,508,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,708,333.33
Life Support: 50,000 (+) 50,000.00 = 4,758,333.33
Sensors: 50 x 2,000 (+) 100,000.00 = 4,858,333.33
Heat Sinks (Double): 14 x 6,000 (+) 84,000.00 = 4,942,333.33
Arm Actuators: 50 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 23,000.00 = 4,965,333.33
Leg Actuators: 50 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 35,000.00 = 5,000,333.33
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,000,333.33
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
ATM 6 125,000 125,000.00
ATM 6 125,000 (+) 125,000.00 = 250,000.00
ATM 6 (Ammo 10) [Empty Bin] 0 (+) 0.00 = 250,000.00
ATM 6 (Ammo 10) [Empty Bin] 0 (+) 0.00 = 250,000.00
ATM 6 (Ammo 10) [ER] [Empty Bin] 0 (+) 0.00 = 250,000.00
ATM 6 (Ammo 10) [HE] [Empty Bin] 0 (+) 0.00 = 250,000.00
CASE 2 x 50,000 (+) 100,000.00 = 350,000.00
ER Large Laser 200,000 (+) 200,000.00 = 550,000.00
ER Large Laser 200,000 (+) 200,000.00 = 750,000.00
Jump Jets 50 x (5 x 5) x 200 (+) 250,000.00 = 1,000,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,000,000.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,000,333.33
Weapons and Equipment Cost: (+) 1,000,000.00 = 6,000,333.33
BattleMech Cost Multiplier: 1 + (50 / 100) (*) 1.50 = 9,000,500.00
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 9,000,500.00
|