Cost Breakdown
Name/Model: Ryoken II
Technology: Clan
Tonnage: 75
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (216 pts) 13.5 x 10,000 135,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 255,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 405,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 7,905,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,105,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,305,000.00
Life Support: 50,000 (+) 50,000.00 = 9,355,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 9,505,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 9,565,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 9,599,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 9,652,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,652,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 250,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 400,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 550,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 700,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 700,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 700,000.00
LRM 15 175,000 (+) 175,000.00 = 875,000.00
LRM 15 175,000 (+) 175,000.00 = 1,050,000.00
LRM 15 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
LRM 15 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,050,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,652,000.00
Weapons and Equipment Cost: (+) 1,050,000.00 = 10,702,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 18,728,500.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 18,728,500.00
|