Cost Breakdown
Name/Model: Fury TR
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (268 pts) 15.0 x 20,000 300,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 380,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 420,000.00
Engine (XL) (20,000 x 240 x 80) / 75 (+) 5,120,000.00 = 5,540,000.00
Turret 3.5 x 5,000 (+) 17,500.00 = 5,557,500.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,557,500.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 450,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 450,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 450,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 510,000.00
Silver Bullet Gauss Rifle 350,000 (+) 350,000.00 = 860,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 860,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 860,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 876,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 892,000.00
Sponson Turrets 0.5 x 4,000 (+) 2,500.00 = 894,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 894,500.00
=====================================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost 5,557,500.00
Weapons and Equipment Cost (+) 894,500.00 = 6,452,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 11,613,600.00
---------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 11,613,600.00
|