Cost Breakdown
Name/Model: Black Dagger Automated Combat Platform Model No. 365DX
Technology: Inner Sphere
Tonnage: 50
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (175 pts) 10.0 x 20,000 200,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 250,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 275,000.00
Engine (Light Fusion) (15,000 x 180 x 50) / 75 (+) 1,800,000.00 = 2,075,000.00
Turret 2 x 5,000 (+) 10,000.00 = 2,085,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,085,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 200,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 200,000.00
Hyper-Velocity AC/10 230,000 (+) 230,000.00 = 430,000.00
Hyper-Velocity AC/10 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 430,000.00
Hyper-Velocity AC/10 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 430,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 438,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 447,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 447,000.00
Medium Laser 40,000 (+) 40,000.00 = 487,000.00
Medium Laser 40,000 (+) 40,000.00 = 527,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 527,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 2,085,000.00
Weapons and Equipment Cost (+) 527,000.00 = 2,612,000.00
Combat Vehicle Cost Multiplier 1 + (50 / 200) (*) 1.25 = 3,265,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,265,000.00
|