Cost Breakdown
Name/Model: Raptor IV RPT-F22M3
Technology: Inner Sphere (Mixed)
Tonnage: 40
Configuration: Biped BattleMech
=========================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (137 pts) 7.5 x 20,000 150,000.00
Internal Structure (Endo Steel): 40 x 1,600 x 1 (+) 64,000.00 = 214,000.00
Myomer (MASC): (320 x 2 x 1,000) + (40 x 2,000) (+) 720,000.00 = 934,000.00
Engine (XXL): (100,000 x 320 x 40) / 75 (+) 17,066,666.67 = 18,000,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 19,200,666.67
Cockpit (Small): 175,000 (+) 175,000.00 = 19,375,666.67
Life Support: 50,000 (+) 50,000.00 = 19,425,666.67
Sensors: 40 x 2,000 (+) 80,000.00 = 19,505,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 19,565,666.67
Arm Actuators: 40 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 12,000.00 = 19,577,666.67
Leg Actuators: 40 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 28,000.00 = 19,605,666.67
-------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 19,605,666.67
=========================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------
Chaff Pod 2,000 2,000.00
Chameleon LPS 600,000 (+) 600,000.00 = 602,000.00
Null-Signature System 1,400,000 (+) 1,400,000.00 = 2,002,000.00
Supercharger (C) 320 x 10,000 (+) 3,200,000.00 = 5,202,000.00
Thunderbolt 15 325,000 (+) 325,000.00 = 5,527,000.00
Thunderbolt 15 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 5,527,000.00
Thunderbolt 15 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 5,527,000.00
-------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 5,527,000.00
=========================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------
Structural Cost: 19,605,666.67
Weapons and Equipment Cost: (+) 5,527,000.00 = 25,132,666.67
BattleMech Cost Multiplier: 1 + (40 / 100) (*) 1.40 = 35,185,733.33
-------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 35,185,733.00
|