Cost Breakdown
Name/Model: Stone Rhino Ranger
Technology: Clan
Tonnage: 100
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (297 pts) 15.5 x 20,000 310,000.00
Internal Structure (Endo Steel): 100 x 1,600 x 1 (+) 160,000.00 = 470,000.00
Myomer (Standard): 100 x 2,000 (+) 200,000.00 = 670,000.00
Engine (XL): (20,000 x 400 x 100) / 75 (+) 10,666,666.67 = 11,336,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 12,536,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 12,736,666.67
Life Support: 50,000 (+) 50,000.00 = 12,786,666.67
Sensors: 100 x 2,000 (+) 200,000.00 = 12,986,666.67
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 13,076,666.67
Arm Actuators: 100 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 46,000.00 = 13,122,666.67
Leg Actuators: 100 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 70,000.00 = 13,192,666.67
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 13,192,666.67
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 180,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 260,000.00
ER Micro Laser 10,000 (+) 10,000.00 = 270,000.00
ER Micro Laser 10,000 (+) 10,000.00 = 280,000.00
ER Small Laser 11,250 (+) 11,250.00 = 291,250.00
Large Pulse Laser 175,000 (+) 175,000.00 = 466,250.00
Large Pulse Laser 175,000 (+) 175,000.00 = 641,250.00
LB 2-X AC 150,000 (+) 150,000.00 = 791,250.00
LB 2-X AC 150,000 (+) 150,000.00 = 941,250.00
LB 2-X AC 150,000 (+) 150,000.00 = 1,091,250.00
LB 2-X AC 150,000 (+) 150,000.00 = 1,241,250.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,241,250.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 1,241,250.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,301,250.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,361,250.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,361,250.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 13,192,666.67
Weapons and Equipment Cost: (+) 1,361,250.00 = 14,553,916.67
BattleMech Cost Multiplier: 1 + (100 / 100) (*) 2.00 = 29,107,833.33
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 29,107,833.00
|