Cost Breakdown
Name/Model: Swordsman II SWDII-10
Technology: Inner Sphere (Mixed)
Tonnage: 75
Configuration: Biped BattleMech
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (230 pts) 12.0 x 20,000 240,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 360,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 510,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 8,010,000.00
Gyro (XL): 2.0 x 750,000 (+) 1,500,000.00 = 9,510,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,710,000.00
Life Support: 50,000 (+) 50,000.00 = 9,760,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 9,910,000.00
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 10,000,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 10,034,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 10,087,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,087,000.00
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
CASE II 175,000 175,000.00
ER Large Laser (C) 200,000 (+) 200,000.00 = 375,000.00
ER Large Laser (C) 200,000 (+) 200,000.00 = 575,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 675,000.00
MML 5 75,000 (+) 75,000.00 = 750,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 750,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 750,000.00
Rotary AC/5 275,000 (+) 275,000.00 = 1,025,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,025,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,025,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,025,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,025,000.00
=======================================================================================================================
BattleMech Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,087,000.00
Weapons and Equipment Cost: (+) 1,025,000.00 = 11,112,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 19,446,000.00
-----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 19,446,000.00
|