Cost Breakdown
Name/Model: Crótalo II
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (277 pts) 14.0 x 25,000 350,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 450,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 500,000.00
Engine (XL) (20,000 x 300 x 100) / 75 (+) 8,000,000.00 = 8,500,000.00
Turret 4 x 5,000 (+) 20,000.00 = 8,520,000.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 8,520,000.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 350,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 350,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 350,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 750,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 750,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 750,000.00
MML 9 (Ammo 11) [SRM] [Empty Bin] 0 (+) 0.00 = 750,000.00
MML 9 (Ammo 13) [LRM] [Empty Bin] 0 (+) 0.00 = 750,000.00
MML 9 w/ Artemis IV FCS 125,000 + 100,000 (+) 225,000.00 = 975,000.00
PPC 200,000 (+) 200,000.00 = 1,175,000.00
Vehicular Jump Jets 100 x (3 x 3) x 200 (+) 180,000.00 = 1,355,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,355,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 8,520,000.00
Weapons and Equipment Cost (+) 1,355,000.00 = 9,875,000.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 19,750,000.00
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 19,750,000.00
|