Cost Breakdown
Name/Model: Labor Driver
Technology: Inner Sphere
Tonnage: 30
Configuration: Biped IndustrialMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Industrial): (53 pts) 5.0 x 5,000 25,000.00
Internal Structure (Industrial): 30 x 300 x 1 (+) 9,000.00 = 34,000.00
Myomer (Standard): 30 x 2,000 (+) 60,000.00 = 94,000.00
Engine (Fuel Cell): (3,500 x 90 x 30) / 75 (+) 126,000.00 = 220,000.00
Gyro (Standard): 1.0 x 300,000 (+) 300,000.00 = 520,000.00
Cockpit (Industrial): 100,000 (+) 100,000.00 = 620,000.00
Life Support: 50,000 (+) 50,000.00 = 670,000.00
Sensors: 30 x 2,000 (+) 60,000.00 = 730,000.00
Heat Sinks (Single): 1 x 2,000 (+) 2,000.00 = 732,000.00
Arm Actuators: 30 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 9,900.00 = 741,900.00
Leg Actuators: 30 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 21,000.00 = 762,900.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 762,900.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Heavy-Duty Pile Driver 100,000 100,000.00
Power Amplifier 0.5 x 20,000 (+) 10,000.00 = 110,000.00
Small Laser 11,250 (+) 11,250.00 = 121,250.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 121,250.00
=====================================================================================================================
IndustrialMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 762,900.00
Weapons and Equipment Cost: (+) 121,250.00 = 884,150.00
IndustrialMech Cost Multiplier: 1 + (30 / 400) (*) 1.08 = 950,461.25
---------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 950,461.00
|