Cost Breakdown
Name/Model: Jinete JNT-52B
Technology: Inner Sphere
Tonnage: 40
Configuration: Biped OmniMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous): (127 pts) 7.5 x 15,000 112,500.00
Internal Structure (Endo Steel): 40 x 1,600 x 1 (+) 64,000.00 = 176,500.00
Myomer (Standard): 40 x 2,000 (+) 80,000.00 = 256,500.00
Engine (XL): (20,000 x 280 x 40) / 75 (+) 2,986,666.67 = 3,243,166.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 4,143,166.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,343,166.67
Life Support: 50,000 (+) 50,000.00 = 4,393,166.67
Sensors: 40 x 2,000 (+) 80,000.00 = 4,473,166.67
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 4,539,166.67
Arm Actuators: 40 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 12,000.00 = 4,551,166.67
Leg Actuators: 40 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 28,000.00 = 4,579,166.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,579,166.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Jump Jets 40 x (5 x 5) x 200 200,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 300,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 400,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 500,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 600,000.00
Partial Wing 3 x 50,000 (+) 150,000.00 = 750,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 750,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,579,166.67
Weapons and Equipment Cost: (+) 750,000.00 = 5,329,166.67
OmniMech Conversion Cost: (4,579,166.67 + 750,000.00) x 0.25 (+) 1,332,291.67 = 6,661,458.33
BattleMech Cost Multiplier: 1 + (40 / 100) (*) 1.40 = 9,326,041.67
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 9,326,042.00
|