Cost Breakdown
Name/Model: Brigadier BGR23
Technology: Inner Sphere (Mixed)
Tonnage: 55
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (182 pts) 9.5 x 20,000 190,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 278,000.00
Myomer (MASC): (330 x 2 x 1,000) + (55 x 2,000) (+) 770,000.00 = 1,048,000.00
Engine (XL): (20,000 x 330 x 55) / 75 (+) 4,840,000.00 = 5,888,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 7,088,000.00
Cockpit (Standard): (Armored) 200,000 + (1 x 150,000) (+) 350,000.00 = 7,438,000.00
Life Support: 50,000 (+) 50,000.00 = 7,488,000.00
Sensors: 55 x 2,000 (+) 110,000.00 = 7,598,000.00
Heat Sinks (Double): 16 x 6,000 (+) 96,000.00 = 7,694,000.00
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 25,300.00 = 7,719,300.00
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 7,757,800.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,757,800.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Large Laser (C) 200,000 200,000.00
ER Large Laser (C) 200,000 (+) 200,000.00 = 400,000.00
Jump Jets 55 x (6 x 6) x 200 (+) 396,000.00 = 796,000.00
Sword 3 x 10,000 (+) 30,000.00 = 826,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 826,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,757,800.00
Weapons and Equipment Cost: (+) 826,000.00 = 8,583,800.00
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 13,304,890.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 13,304,890.00
|