Cost Breakdown
Name/Model: Champion CHP-3N
Technology: Inner Sphere
Tonnage: 60
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (134 pts) 7.5 x 20,000 150,000.00
Internal Structure (Standard): 60 x 400 x 1 (+) 24,000.00 = 174,000.00
Myomer (Standard): 60 x 2,000 (+) 120,000.00 = 294,000.00
Engine (XL): (20,000 x 300 x 60) / 75 (+) 4,800,000.00 = 5,094,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,994,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,194,000.00
Life Support: 50,000 (+) 50,000.00 = 6,244,000.00
Sensors: 60 x 2,000 (+) 120,000.00 = 6,364,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 6,424,000.00
Arm Actuators: 60 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 12,000.00 = 6,436,000.00
Leg Actuators: 60 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 42,000.00 = 6,478,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,478,000.00
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Large Laser 100,000 100,000.00
Large Laser 100,000 (+) 100,000.00 = 200,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 600,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 600,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 600,000.00
Medium Laser 40,000 (+) 40,000.00 = 640,000.00
Medium Laser 40,000 (+) 40,000.00 = 680,000.00
Small Laser 11,250 (+) 11,250.00 = 691,250.00
Small Laser 11,250 (+) 11,250.00 = 702,500.00
SRM 6 (Ammo 15) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 702,500.00
SRM 6 w/ Artemis IV FCS 80,000 + 100,000 (+) 180,000.00 = 882,500.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 882,500.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,478,000.00
Weapons and Equipment Cost: (+) 882,500.00 = 7,360,500.00
BattleMech Cost Multiplier: 1 + (60 / 100) (*) 1.60 = 11,776,800.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 11,776,800.00
|