Cost Breakdown
Name/Model: Uziel UZL-2SCWC
Technology: Clan
Tonnage: 50
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (163 pts) 8.5 x 20,000 170,000.00
Internal Structure (Endo Steel): 50 x 1,600 x 1 (+) 80,000.00 = 250,000.00
Myomer (Standard): 50 x 2,000 (+) 100,000.00 = 350,000.00
Engine (XL): (20,000 x 300 x 50) / 75 (+) 4,000,000.00 = 4,350,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,250,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 5,450,000.00
Life Support: 50,000 (+) 50,000.00 = 5,500,000.00
Sensors: 50 x 2,000 (+) 100,000.00 = 5,600,000.00
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 5,672,000.00
Arm Actuators: 50 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 10,000.00 = 5,682,000.00
Leg Actuators: 50 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 35,000.00 = 5,717,000.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,717,000.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 180,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 260,000.00
ER Small Laser 11,250 (+) 11,250.00 = 271,250.00
ER Small Laser 11,250 (+) 11,250.00 = 282,500.00
Jump Jets 50 x (6 x 6) x 200 (+) 360,000.00 = 642,500.00
Large Pulse Laser 175,000 (+) 175,000.00 = 817,500.00
LB 2-X AC 150,000 (+) 150,000.00 = 967,500.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 967,500.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 967,500.00
SRM 6 80,000 (+) 80,000.00 = 1,047,500.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,047,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,047,500.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,717,000.00
Weapons and Equipment Cost: (+) 1,047,500.00 = 6,764,500.00
BattleMech Cost Multiplier: 1 + (50 / 100) (*) 1.50 = 10,146,750.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,146,750.00
|