Cost Breakdown
Name/Model: Falcata FCT-3C
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (176 pts) 11.0 x 10,000 110,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 230,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 380,000.00
Engine (Fusion): (5,000 x 300 x 75) / 75 (+) 1,500,000.00 = 1,880,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,780,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,980,000.00
Life Support: 50,000 (+) 50,000.00 = 3,030,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 3,180,000.00
Heat Sinks (Double): 19 x 6,000 (+) 114,000.00 = 3,294,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 24,750.00 = 3,318,750.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 3,371,250.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,371,250.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
PPC 200,000 200,000.00
PPC 200,000 (+) 200,000.00 = 400,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 700,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,000,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,000,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,371,250.00
Weapons and Equipment Cost: (+) 1,000,000.00 = 4,371,250.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 7,649,687.50
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 7,649,688.00
|