Cost Breakdown
Name/Model: ow Lord he dropping
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Standard): (168 pts) 10.5 x 10,000 105,000.00
Internal Structure (Standard): 75 x 400 x 1 (+) 30,000.00 = 135,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 285,000.00
Engine (XL): (20,000 x 225 x 75) / 75 (+) 4,500,000.00 = 4,785,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,685,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 5,885,000.00
Life Support: 50,000 (+) 50,000.00 = 5,935,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 6,085,000.00
Heat Sinks (Single): 4 x 2,000 (+) 8,000.00 = 6,093,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 22,500.00 = 6,115,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 6,168,000.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,168,000.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
Large Laser 100,000 100,000.00
Large Laser 100,000 (+) 100,000.00 = 200,000.00
Thumper 187,500 (+) 187,500.00 = 387,500.00
Thumper 187,500 (+) 187,500.00 = 575,000.00
Thumper (Ammo 20) [Empty Bin] 0 (+) 0.00 = 575,000.00
Thumper (Ammo 20) [Empty Bin] 0 (+) 0.00 = 575,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 575,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,168,000.00
Weapons and Equipment Cost: (+) 575,000.00 = 6,743,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 11,800,250.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 11,800,250.00
|