Cost Breakdown
Name/Model: Pike Support Vehicle (Clan XL)
Technology: Clan
Tonnage: 60
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (163 pts) 8.5 x 20,000 170,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 230,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 260,000.00
Engine (XL) (20,000 x 180 x 60) / 75 (+) 2,880,000.00 = 3,140,000.00
Turret 3 x 5,000 (+) 15,000.00 = 3,155,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,155,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 225,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 625,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,025,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,025,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,025,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,025,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,025,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,025,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,025,000.00
SRM 2 10,000 (+) 10,000.00 = 1,035,000.00
SRM 2 10,000 (+) 10,000.00 = 1,045,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 1,045,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,045,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 3,155,000.00
Weapons and Equipment Cost (+) 1,045,000.00 = 4,200,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 6,720,000.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,720,000.00
|