Cost Breakdown
Name/Model: Raven RVN-007A
Technology: Inner Sphere
Tonnage: 35
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (107 pts) 6.0 x 20,000 120,000.00
Internal Structure (Endo Steel): 35 x 1,600 x 1 (+) 56,000.00 = 176,000.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 246,000.00
Engine (Fusion): (5,000 x 210 x 35) / 75 (+) 490,000.00 = 736,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 1,636,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 1,836,000.00
Life Support: 50,000 (+) 50,000.00 = 1,886,000.00
Sensors: 35 x 2,000 (+) 70,000.00 = 1,956,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,016,000.00
Arm Actuators: 35 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 7,000.00 = 2,023,000.00
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 2,047,500.00
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,047,500.00
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Small Laser 11,250 (+) 11,250.00 = 61,250.00
ER Small Laser 11,250 (+) 11,250.00 = 72,500.00
ER Small Laser 11,250 (+) 11,250.00 = 83,750.00
Light PPC 150,000 (+) 150,000.00 = 233,750.00
Light PPC 150,000 (+) 150,000.00 = 383,750.00
Streak SRM 4 90,000 (+) 90,000.00 = 473,750.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 473,750.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 473,750.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,047,500.00
Weapons and Equipment Cost: (+) 473,750.00 = 2,521,250.00
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 3,403,687.50
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 3,403,688.00
|