Cost Breakdown
Name/Model: CGR-1AH Charger
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (236 pts) 15.0 x 10,000 150,000.00
Internal Structure (Endo Steel): 80 x 1,600 x 1 (+) 128,000.00 = 278,000.00
Myomer (Standard): 80 x 2,000 (+) 160,000.00 = 438,000.00
Engine (Fusion): (5,000 x 320 x 80) / 75 (+) 1,706,666.67 = 2,144,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 3,344,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 3,544,666.67
Life Support: 50,000 (+) 50,000.00 = 3,594,666.67
Sensors: 80 x 2,000 (+) 160,000.00 = 3,754,666.67
Heat Sinks (Single): 4 x 2,000 (+) 8,000.00 = 3,762,666.67
Arm Actuators: 80 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 30,400.00 = 3,793,066.67
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 3,849,066.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,849,066.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Hatchet 6 x 5,000 30,000.00
Jump Jets 80 x (4 x 4) x 200 (+) 256,000.00 = 286,000.00
Large Laser 100,000 (+) 100,000.00 = 386,000.00
Large Laser 100,000 (+) 100,000.00 = 486,000.00
PPC 200,000 (+) 200,000.00 = 686,000.00
Small Laser 11,250 (+) 11,250.00 = 697,250.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 697,250.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,849,066.67
Weapons and Equipment Cost: (+) 697,250.00 = 4,546,316.67
BattleMech Cost Multiplier: 1 + (80 / 100) (*) 1.80 = 8,183,370.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 8,183,370.00
|