Cost Breakdown
Name/Model: Luchador LDR-XLE2
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped OmniMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (232 pts) 14.5 x 10,000 145,000.00
Internal Structure (Endo Steel): 80 x 1,600 x 1 (+) 128,000.00 = 273,000.00
Myomer (MASC): (400 x 4 x 1,000) + (80 x 2,000) (+) 1,760,000.00 = 2,033,000.00
Engine (Light Fusion): (15,000 x 400 x 80) / 75 (+) 6,400,000.00 = 8,433,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,633,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,833,000.00
Life Support: 50,000 (+) 50,000.00 = 9,883,000.00
Sensors: 80 x 2,000 (+) 160,000.00 = 10,043,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 10,103,000.00
Arm Actuators: 80 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 36,800.00 = 10,139,800.00
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 10,195,800.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,195,800.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Small Laser 11,250 11,250.00
ER Small Laser 11,250 (+) 11,250.00 = 22,500.00
ER Small Laser 11,250 (+) 11,250.00 = 33,750.00
ER Small Laser 11,250 (+) 11,250.00 = 45,000.00
Hatchet 6 x 5,000 (+) 30,000.00 = 75,000.00
Jump Jets 80 x (3 x 3) x 200 (+) 144,000.00 = 219,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 219,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,195,800.00
Weapons and Equipment Cost: (+) 219,000.00 = 10,414,800.00
OmniMech Conversion Cost: (10,195,800.00 + 219,000.00) x 0.25 (+) 2,603,700.00 = 13,018,500.00
BattleMech Cost Multiplier: 1 + (80 / 100) (*) 1.80 = 23,433,300.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 23,433,300.00
|