Cost Breakdown
Name/Model: Grasshopper GHR-5J
Technology: Inner Sphere
Tonnage: 70
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (208 pts) 13.0 x 10,000 130,000.00
Internal Structure (Standard): 70 x 400 x 1 (+) 28,000.00 = 158,000.00
Myomer (Standard): 70 x 2,000 (+) 140,000.00 = 298,000.00
Engine (Fusion): (5,000 x 280 x 70) / 75 (+) 1,306,666.67 = 1,604,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,504,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,704,666.67
Life Support: 50,000 (+) 50,000.00 = 2,754,666.67
Sensors: 70 x 2,000 (+) 140,000.00 = 2,894,666.67
Heat Sinks (Single): 12 x 2,000 (+) 24,000.00 = 2,918,666.67
Arm Actuators: 70 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 32,200.00 = 2,950,866.67
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 2,999,866.67
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,999,866.67
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
ER Large Laser 200,000 (+) 200,000.00 = 300,000.00
Jump Jets 70 x (4 x 4) x 200 (+) 224,000.00 = 524,000.00
Medium Laser 40,000 (+) 40,000.00 = 564,000.00
Medium Laser 40,000 (+) 40,000.00 = 604,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 619,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 619,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 619,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 619,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,999,866.67
Weapons and Equipment Cost: (+) 619,000.00 = 3,618,866.67
BattleMech Cost Multiplier: 1 + (70 / 100) (*) 1.70 = 6,152,073.33
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,152,073.00
|