Cost Breakdown
Name/Model: Hydra Pint
Technology: Inner Sphere
Tonnage: 25
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (89 pts) 5.0 x 20,000 100,000.00
Internal Structure (Endo Steel): 25 x 1,600 x 1 (+) 40,000.00 = 140,000.00
Myomer (Standard): 25 x 2,000 (+) 50,000.00 = 190,000.00
Engine (XL): (20,000 x 250 x 25) / 75 (+) 1,666,666.67 = 1,856,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,756,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,956,666.67
Life Support: 50,000 (+) 50,000.00 = 3,006,666.67
Sensors: 25 x 2,000 (+) 50,000.00 = 3,056,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 3,116,666.67
Arm Actuators: 25 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 11,500.00 = 3,128,166.67
Leg Actuators: 25 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 17,500.00 = 3,145,666.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,145,666.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
Jump Jets 25 x (10 x 10) x 200 (+) 500,000.00 = 750,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 750,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,145,666.67
Weapons and Equipment Cost: (+) 750,000.00 = 3,895,666.67
BattleMech Cost Multiplier: 1 + (25 / 100) (*) 1.25 = 4,869,583.33
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 4,869,583.00
|