Cost Breakdown
Name/Model: “St campaighn” Jager mech A (Dragon Slayer) JM6-S
Technology: Inner Sphere
Tonnage: 65
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (125 pts) 7.0 x 20,000 140,000.00
Internal Structure (Standard): 65 x 400 x 1 (+) 26,000.00 = 166,000.00
Myomer (Standard): 65 x 2,000 (+) 130,000.00 = 296,000.00
Engine (Fusion): (5,000 x 260 x 65) / 75 (+) 1,126,666.67 = 1,422,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,322,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,522,666.67
Life Support: 50,000 (+) 50,000.00 = 2,572,666.67
Sensors: 65 x 2,000 (+) 130,000.00 = 2,702,666.67
Heat Sinks (Single): 8 x 2,000 (+) 16,000.00 = 2,718,666.67
Arm Actuators: 65 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 13,000.00 = 2,731,666.67
Leg Actuators: 65 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 45,500.00 = 2,777,166.67
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,777,166.67
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
ER Small Laser 11,250 (+) 11,250.00 = 311,250.00
ER Small Laser 11,250 (+) 11,250.00 = 322,500.00
Gauss Rifle 300,000 (+) 300,000.00 = 622,500.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 622,500.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 622,500.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,777,166.67
Weapons and Equipment Cost: (+) 622,500.00 = 3,399,666.67
BattleMech Cost Multiplier: 1 + (65 / 100) (*) 1.65 = 5,609,450.00
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 5,609,450.00
|