Cost Breakdown
Name/Model: Cooler Whip
Technology: Inner Sphere (Mixed)
Tonnage: 200
Configuration: Superheavy Tripod BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (424 pts) 26.5 x 10,000 265,000.00
Internal Structure (Standard): 200 x 4,000 x 1.2 (+) 960,000.00 = 1,225,000.00
Myomer (Superheavy): 200 x 12,000 (+) 2,400,000.00 = 3,625,000.00
Engine (Fusion): (5,000 x 400 x 200) / 75 (+) 5,333,333.33 = 8,958,333.33
Gyro (Superheavy): 8.0 x 500,000 (+) 4,000,000.00 = 12,958,333.33
Cockpit (Superheavy Tripod): 500,000 (+) 500,000.00 = 13,458,333.33
Life Support: 50,000 (+) 50,000.00 = 13,508,333.33
Sensors: 200 x 2,000 (+) 400,000.00 = 13,908,333.33
Heat Sinks (Double): 73 x 6,000 (+) 438,000.00 = 14,346,333.33
Arm Actuators: 200 x ((100 x 2 x 2) + (50 x 0 x 2) + (80 x 0 x 2)) (+) 80,000.00 = 14,426,333.33
Leg Actuators: 200 x ((150 x 3 x 2) + (80 x 3 x 2) + (120 x 3 x 2)) (+) 420,000.00 = 14,846,333.33
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 14,846,333.33
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Coolant Pod (C) 50,000 50,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 50,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 14,846,333.33
Weapons and Equipment Cost: (+) 50,000.00 = 14,896,333.33
BattleMech Cost Multiplier: 1 + (200 / 100) (*) 3.00 = 44,689,000.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 44,689,000.00
|