Cost Breakdown
Name/Model: Lancelot LNC25-10 MAF
Technology: Inner Sphere
Tonnage: 60
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (197 pts) 11.0 x 20,000 220,000.00
Internal Structure (Endo Steel): 60 x 1,600 x 1 (+) 96,000.00 = 316,000.00
Myomer (Standard): 60 x 2,000 (+) 120,000.00 = 436,000.00
Engine (XL): (20,000 x 360 x 60) / 75 (+) 5,760,000.00 = 6,196,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 7,396,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,596,000.00
Life Support: 50,000 (+) 50,000.00 = 7,646,000.00
Sensors: 60 x 2,000 (+) 120,000.00 = 7,766,000.00
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 7,844,000.00
Arm Actuators: 60 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 12,000.00 = 7,856,000.00
Leg Actuators: 60 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 42,000.00 = 7,898,000.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,898,000.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Small Laser 11,250 11,250.00
ER Small Laser 11,250 (+) 11,250.00 = 22,500.00
Large Laser 100,000 (+) 100,000.00 = 122,500.00
Large Laser 100,000 (+) 100,000.00 = 222,500.00
PPC 200,000 (+) 200,000.00 = 422,500.00
PPC Capacitor 150,000 (+) 150,000.00 = 572,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 572,500.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,898,000.00
Weapons and Equipment Cost: (+) 572,500.00 = 8,470,500.00
BattleMech Cost Multiplier: 1 + (60 / 100) (*) 1.60 = 13,552,800.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 13,552,800.00
|